We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.

Job posting has expired

#alert
Back to search results

Primavera P6 Project Scheduler

Leidos Inc
$65,650.00 - $118,675.00 / yr
United States, Virginia, Reston
1750 Presidents Street (Show on map)
Aug 14, 2026

Description

Leidos Power Delivery Solutions is seeking a P6 Project Scheduler to assist in the oversight and coordination of projects for a large electric utility client. Ideal Candidates will have a strong background in scheduling complex projects and programs related to the planning, design and construction of infrastructure projects. This role will have client facing responsibilities and requires expertise in navigating the regulatory landscape and ensuring projects are delivered on time and within budget.

The P6 Project Scheduler will be part of our Strategic Program & Project Consulting team that provides consulting services to both public-owned and investor-owned electric utilities. These consulting services provide clients with overall project management tasks in the areas of comprehensive engineering design of electrical transmission and distribution, substation and transmission line projects nationwide. This role will require comprehensive understanding of and proficiency with Primavera P6 project scheduling and management software. Candidates must have previous P6 experience in order to execute this position successfully.

This role has remote working capabilities, however periodic travel to client sites throughout Central Ohio, Indiana, Michigan, Oklahoma, Northwest Louisiana, Western Arkansas and/or Northeast Texas may be required. Therefore, candidates located in these areas may be preferred. Candidates across the US will be considered, if willing and able to travel where necessary (likely less than 20% of the time).

Responsibilities:

  • Develop, maintain and drive engineering and construction schedules for various sized transmission & distribution and related projects for public-owned and investor-owned electric utilities located throughout the United States

  • Work with Project Management using earned value management techniques to ensure that schedule and costs are aligned, including the development of recovery plans, to stay within approved limits

  • Partner closely with Engineering Leads and Managers to track and execute client deliverables

  • Develop and produce schedule weekly/monthly project control reports for client and internal management review: which includes resource loading analysis and schedules, critical path items and risk analysis

  • Interfacing directly with the client and internal management to report progress, schedule and risks across a portfolio of electrical distribution projects

  • Assist the project manager with the creation and maintenance of comprehensive project dashboard reports and KPI tracking

Background Requirements/Qualifications:

  • Bachelor's degree in the following disciplines: Engineering, Construction Management, Business or Finance required with a minimum of four years of relevant Primavera P6 scheduling experience

  • Demonstrated technical proficiency in P6, including WBS development, activity coding, logic sequencing, constraint application, resource/cost loading, and critical path analysis
  • Proven ability to build and maintain integrated master schedules (IMS) in P6, including baseline management, schedule updates, progress tracking, and variance analysis
  • Experience performing schedule quality/health checks in P6 (e.g., DCMA 14-point assessment)to identify logic errors, open ends, constraint issues, leads/lags, and float anomalies.
  • Skilled in generating P6 schedule reports, layouts, and filters, and exporting schedule data for stakeholder reporting and analysis
  • Proficient in navigating P6 database structures (EPS), import/export functionality (XER/XML), schedule baselining and schedule comparison tools.
  • Experience conducting schedule risk analysis and variance reporting directly within P6 preferred
  • Strong written and verbal communication skills for sharing schedule information with stakeholders.
  • Proficiency utilizing MS Project suite with a heavy emphasis on MS Excel.
  • Track contractor performance against planned activities and participate in schedule review meetings.
  • Develop and analyze schedule scenarios to understand the effects of potential scope adjustments.

If you're looking for a remote opportunity that will take part in exciting projects shaping the future of the electric grid, we want to hear from you! Apply Today!

PDSPM

If you're looking for comfort, keep scrolling. At Leidos, we outthink, outbuild, and outpace the status quo - because the mission demands it. We're not hiring followers. We're recruiting the ones who disrupt, provoke, and refuse to fail. Step 10 is ancient history. We're already at step 30 - and moving faster than anyone else dares.

Original Posting:

For U.S. Positions: While subject to change based on business needs, Leidos reasonably anticipates that this job requisition will remain open for at least 3 days with an anticipated close date of no earlier than 3 days after the original posting date as listed above.


Pay Range:

The Leidos pay range for this job level is a general guideline onlyand not a guarantee of compensation or salary. Additional factors considered in extending an offer include (but are not limited to) responsibilities of the job, education, experience, knowledge, skills, and abilities, as well as internal equity, alignment with market data, applicable bargaining agreement (if any), or other law.

About Leidos

Leidos is an industry and technology leader serving government and commercial customers with smarter, more efficient digital and mission innovations. Headquartered in Reston, Virginia, with 47,000 global employees, Leidos reported annual revenues of approximately $16.7 billion for the fiscal year ended January 3, 2025. For more information, visit www.Leidos.com.

Pay and Benefits

Pay and benefits are fundamental to any career decision. That's why we craft compensation packages that reflect the importance of the work we do for our customers. Employment benefits include competitive compensation, Health and Wellness programs, Income Protection, Paid Leave and Retirement. More details are available at www.leidos.com/careers/pay-benefits.

Securing Your Data

Beware of fake employment opportunities using Leidos' name. Leidos will never ask you to provide payment-related information during any part of the employment application process (i.e., ask you for money), nor will Leidos ever advance money as part of the hiring process (i.e., send you a check or money order before doing any work). Further, Leidos will only communicate with you through emails that are generated by the Leidos.com automated system - never from free commercial services (e.g., Gmail, Yahoo, Hotmail) or via WhatsApp, Telegram, etc. If you received an email purporting to be from Leidos that asks for payment-related information or any other personal information (e.g., about you or your previous employer), and you are concerned about its legitimacy, please make us aware immediately by emailing us at LeidosCareersFraud@leidos.com.

If you believe you are the victim of a scam, contact your local law enforcement and report the incident to the U.S. Federal Trade Commission.

Commitment to Non-Discrimination

All qualified applicants will receive consideration for employment without regard to sex, race, ethnicity, age, national origin, citizenship, religion, physical or mental disability, medical condition, genetic information, pregnancy, family structure, marital status, ancestry, domestic partner status, sexual orientation, gender identity or expression, veteran or military status, or any other basis prohibited by law. Leidos will also consider for employment qualified applicants with criminal histories consistent with relevant laws.

#Remote

(web-77cf7d65c7-bbl8f)